Tank for 1st Artemis touchdown on the moon
When buying with links to our articles, it may gain the future and partnership partners in the commission.
In NASA’s Michoud assembly facility in New Orleans, the liquid hydrogen tank of the Artemis 3 Space System Rocket to the final assembly area of the factory on April 22, 2025. | Credit: NASA/Stephen B. Sibel
As NASA is close to returning the first astronauts to the moon since Apollo program More than 50 years ago, progress has been made on devices that will send the following humans to the moon.
With all devices in Florida L Space launch (SLS) The missile that will launch the Artemis 2 crew around the moon in 2026, work on the next streak that will fly on it Artemis 3The planned as the first new program for the program.
What is this?
The 130 -foot motivation tank (40 meters) is one of the five main elements that include the basic SLS stage of 212 feet (65 meters). The theater will be used, along with the four RS-25 missile engines, and the installed solid missile reinforcements alongside, to launch the ARTEMIS 3 Orion spacecraft and its crew to walk on the moon.
The teams recently completed the recent application of the thermal protection system and will now continue to equip the liquid hydrogen tank with the final systems it needs to fly on the ARTEMIS 3 mission.
Where is she?
NASA assembly facility is located in NASA in East New Orleans, Louisiana.
Before working as a factory for the components of Artemis Sls Core Stage Saturn the fifth The stages of missiles and external tanks for the space shuttle program for 30 years.
Why is it amazing?
This represents another step forward before humans again take a step on the moon.
The same image is amazing, given how photographer Stephen Sibel is able to capture the reflection of the liquid hydrogen tank in a standing water body where the device was transferred to the following treatment facility.
Want to know more?
You can read More about the ARTEMIS 3 mission and Completion of other components For SLS in Mishoud.